By around 12 pm Friday, more than half of the west side of Scott between Washington and Clay streets are poured with concrete.Scott / Washington & Jackson
Demolition of the west side of Scott Street between Washington and Jackson streets is scheduled for Monday, August 31. The new concrete will be poured Wednesday, September 2. To cure the concrete surface and and allow adequate time for drying, garage access on this stretch of Scott will be restricted from:
8 am Monday, August 31 to 4 pm Saturday, September 5.
To help accommodate residents who will not have access to driveways and garages, their vehicles will be allowed to park along the east side of Scott Street. One-lane traffic will be limited to local residents only.
8 am Monday, August 31 to 4 pm Saturday, September 5.
To help accommodate residents who will not have access to driveways and garages, their vehicles will be allowed to park along the east side of Scott Street. One-lane traffic will be limited to local residents only.
Other activities in the area next week:
Vallejo / Gough & Van Ness
Test pipes, make 48 changeovers from old to new pipes, and 7 connections to buildings all week.